The Practice undertook a very detailed element by element inspection of the cathedral and from that was appointed as conservation adviser, preparing drawing, schedules and specifications. Work is about to begin in site in the Spring of 2010.
The Practice was commissioned to provide a full design service from feasibility, design, tender and on site. The work was conservation led and included the conservation of clay, brick and lime-ash floors and chinoiserie stair balustrade.
42 Farlough RoadDungannonCounty TyroneNorthern IrelandBT71 4DU
0044 (0)28 8774 8111
0044 (0)28 8774 6597
chris.mccollum